All core elements of the claim are directly confirmed by HIVE Digital's own official press release on hivedigitaltechnologies.com (May 18, 2026): (1) the 320 MW capacity figure, (2) the Ontario/Greater Toronto Area location, (3) the BUZZ HPC subsidiary vehicle, (4) more than 100,000 GPUs at full build-out, and (5) the H2 2027 target online date. These facts are independently corroborated by the Newsfilecorp wire retransmission, The Block, and Cryptopolitan. The claim accurately characterizes the announcement as an 'AI Gigafactory' - the exact term used in HIVE's own press release. The only immaterial discrepancy is the claim title's implicit reference to a '40%' stock rally (from the original link title), while The Block's article body corrected this to 35%; this does not affect the substance of the project announcement itself.