Hyundai Engineering wins preferred bids for 2.3826 trillion-won power projects

  • Hyundai Engineering won preferred-bid status for two South Korean power-generation projects.
  • The projects total 2.3826 trillion won, or approximately $1.8 billion.
  • Both LNG plants are designed for future hydrogen co-firing and hydrogen-only operation.

Hyundai Engineering has been selected as preferred bidder for two South Korean power projects worth a combined 2.3826 trillion won, or approximately $1.8 billion. The Yongin Combined Heat and Power Plant will provide 1,050MW of electricity and 517 Gcal per hour of heat for the Yongin Semiconductor Cluster, while the New Honam Combined Cycle Power Plant will add 500MW at the former Honam Thermal Power Plant site in Yeosu. Both facilities will initially use LNG and are designed to transition to hydrogen co-firing and eventually hydrogen-only operation. Hyundai Engineering says the awards strengthen its position in energy infrastructure and support its expansion into hydrogen power, small modular reactor auxiliary facilities and nuclear fusion.

本网站上的信息是使用AI生成的,我们无法保证其准确性。 请仅作为参考信息使用。