Voltage Energy showcases LYNX PLUS and IBEX PLUS at Intersolar Europe 2026

Voltage Energy Group presented its utility-scale solar EBOS (electrical balance of system) portfolio at Intersolar Europe 2026 in Munich, centering on the LYNX PLUS and IBEX PLUS pre-assembled cable-harness systems. The company said it is expanding from standalone cabling products to system-level EBOS packages designed to help developers and EPCs (engineering, procurement and construction contractors) simplify project design, reduce installation complexity and improve long-term reliability as solar plants shift to higher-power, higher-voltage architectures. Compared with traditional cable-by-cable wiring, the solutions can reduce cable consumption by up to 33% and cut installation time by up to 50%, according to the company. Voltage Energy said LYNX PLUS supports main cable sizes up to 400 mm², or 853 A, reduces voltage drop by up to 34% versus conventional 240 mm² designs and removes the need for traditional combiner boxes. IBEX PLUS is aimed at mid-current applications of 70–168 A and, with a design using 97% flexible aluminum cable, is up to 41% lighter than conventional copper alternatives and can lower CapEx (capital expenditure) by up to 27%. The company also said both LYNX PLUS and IBEX PLUS have obtained UL 2 kV certification in the United States, while European certification is underway.

The information on this website is generated using AI and we cannot guarantee its accuracy. Please use it as reference information only.