Nine Mile Metals reports 125 metres of new mineralized intervals at Wedge Mine

The results came from a previously undrilled area and form part of a 10,000-metre drilling campaign aimed at expanding the project's mineralized footprint.

Summary

verifying reliability

Terms & Concepts

No specialized terms available for this topic.