Goliath Resources reported assay results from six drill holes at its 100%-owned Golddigger Property in British Columbia’s Golden Triangle. Hole GD-26-436 intersected near-surface mineralization at the Surebet Zone grading 7.38 g/t AuEq over 35.7 meters, including 19.51 g/t AuEq over 8.32 meters, with visible gold, native silver and sulphide-bearing quartz stockwork and breccia. Other results included two gold-bearing splays in GD-26-426, 5.83 g/t gold over 5.95 meters at the Eldorado Zone in GD-26-431, and additional AuEq intercepts in GD-26-421 and GD-26-424. Goliath said 52 of 98 planned 2026 holes had been completed, totaling 31,994 meters, while the mineralized system remains open laterally and at depth.