Q2 Metals Corp. reported initial assays from two holes totaling 1,162 metres at its Cisco Lithium Project in Quebec, including three intervals in hole 93: 60.8 metres at 1.24% Li2O, 213.8 metres at 1.93% Li2O and 403.7 metres at 1.57% Li2O. The company said the intervals collectively span about 678 metres of the 803-metre hole, making it the best hole drilled at Cisco by total mineralized pegmatite. About 170 metres of the deepest interval lies outside the conceptual pit shell used in the April 2026 Mineral Resource Estimate, while the shallowest interval began about 14 metres vertically below surface. Q2 said 9,552 metres across 22 holes had been completed in the 2026 Summer Drill Program, which is focused on converting Inferred Mineral Resources to the Indicated category. Drilling is expected to continue through the fall and winter, with results from the summer and fall programs intended to support an update to the Inferred Mineral Resource Estimate. The company is also advancing regional exploration and a Preliminary Economic Assessment.