Hanwha Aerospace signs 49.6 billion-won Arion-SMET production contract
AI Summary- Hanwha Aerospace signed DAPA's initial Arion-SMET mass-production contract.
- 49.6 billion won ($36.9 million) covers production at Changwon Plant 2.
- DAPA targets operational deployment in 2027–2028 for Army TIGER 4.0.