1911 Gold Corporation reported assay results from eight diamond drill holes totaling 2,955 metres at its wholly owned, operational and fully permitted True North Gold Project in southeastern Manitoba. The drilling tested the potential connection between the L10 Zone and the larger 710-711 Zone outside the 2024 mineral resource estimate. The strongest result was 50.61 grams per tonne of gold over 1.60 metres in hole UG16-26-076, including 65.80 g/t over 1.00 metre, while UG16-26-072 returned 10.73 g/t over 8.90 metres. The company said all eight holes confirmed gold mineralization in multiple veins and validated the L10/710-711 Complex Link. The results are expected to be incorporated into a global mineral resource estimate in the fourth quarter of 2026. 1911 Gold has completed 20 holes totaling 6,563 metres in the L10 resource expansion program, with 11 holes confirming the complex link. Additional assays remain pending, follow-up drilling is planned for 2027 after the resource update, and the company extended the availability period for a second loan tranche with Auramet International to December 4, 2026, subject to an additional cost-to-completion funding condition.