Osaka sets ¥92.113 billion minimum for Yumeshima Phase 2 land sale
AI Summary- Osaka Prefecture and Osaka City set the minimum price for Yumeshima Phase 2 land.
- ¥92.113 billion is the minimum, covering approximately 42 hectares of city-owned land.
- Yumeshima Phase 1’s integrated resort is scheduled to open in autumn 2030.