Obsidian Energy cuts 2026 production guidance to 28,500–29,500 boe/d

Verifying
  • Obsidian Energy lowered its 2026 production guidance.
  • 28,500–29,500 boe/d replaced the previous 29,000–31,000 boe/d range.
  • Two rigs are active in Peace River amid Belly River asset downtime.
The information on this website is generated using AI and we cannot guarantee its accuracy. Please use it as reference information only.