DPM reports 1,054-metre Brevene intercept grading 2.49 g/t AuEq

Verifying
  • DPM Metals reported new drilling results from the Brevene Porphyry South gold-copper discovery.
  • EX_BRESPO_03 returned 1,054 metres grading 2.49 g/t AuEq from 1,172 metres downhole.
  • DPM plans 15,000 metres of additional drilling through 2026 and further delineation in 2027.
The information on this website is generated using AI and we cannot guarantee its accuracy. Please use it as reference information only.