Power Metallic reports deep Lion drilling with grades up to 24.62% CuEq

  • Power Metallic reported first deep-drilling assays from the Lion deposit's summer 2026 program.
  • Hole PML-26-125 returned 5.70 metres grading 14.00% recovered copper equivalent.
  • Power Metallic expects further Lion and regional exploration assays in the coming weeks.

Power Metallic Mines reported the first assays from deep summer 2026 drilling at the Lion deposit, part of its Nisk Project Area in Canada. Hole PML-26-125 reached nearly 800 metres of vertical depth and returned 5.70 metres grading 11.42% copper, 61.57 grams per tonne silver, 0.30 grams per tonne gold, 2.48 grams per tonne palladium, 0.41 grams per tonne platinum and 14.00 grams per tonne nickel, for a recovered copper-equivalent grade of 14.00%. A 2.15-metre interval within the hole graded 24.62% CuEq. Hole PML-26-121a, drilled to the western side of the projected Lion plunge at nearly 650 metres vertical depth, returned 7.70 metres at 3.28% CuEq, including higher-grade intervals. Power Metallic said the drilling establishes that Lion continues at depth and remains incompletely delineated. A third hole, PML-26-128, reached nearly 900 metres vertical depth on the eastern side and encountered copper-sulphide mineralization, with assays pending. The company expects additional results from deep Lion drilling and regional exploration in the coming weeks.

The information on this website is generated using AI and we cannot guarantee its accuracy. Please use it as reference information only.