Integra Resources reported additional growth and expansion drilling results from its producing Florida Canyon Mine in Nevada, identifying resource expansion opportunities at the Madre Shear North Target, Inter-Pit areas between open pits and the North Dump. Highlights included 1.30 g/t gold over 62.5 metres and 0.59 g/t over 167.6 metres at the Central / Radio Tower Saddle, plus 0.48 g/t over 54.9 metres at Madre Shear North. North Dump drilling returned up to 0.39 g/t over 45.7 metres, including 6.12 g/t over 1.5 metres. Integra has completed 30,140 metres of reverse-circulation drilling at Florida Canyon in 2026. The results follow a July 2026 technical report that reported a 74% increase in Mineral Reserves and an extended mine life. The company plans further drilling at Madre Shear North and Inter-Pit areas, as well as 7,000 metres at the Standard Mine, 8 kilometres south of Florida Canyon.