Google has suspended construction of its artificial intelligence data center in Farciennes, Belgium, after a local court ruled that the facility lacked valid planning permission. The site, in a former mining area near Charleroi in Wallonia, had faced sustained opposition from residents over potential water scarcity, environmental pollution and high energy consumption. Google had sought to amend its permit to replace air cooling with a liquid cooling system using water from a nearby river and to consolidate several smaller sites into one larger complex. The company has filed a lawsuit challenging the ruling, with a hearing scheduled for January 2027.