Second drill hole at the Quebec project also returned 211.17 ppm Dy₂O₃ over 2.0 metres and 946.25 ppm HREO over 7.7 metres, supporting a higher-grade zone for follow-up drilling.
43d ago
verifying reliability
No specialized terms available for this topic.