Hyosung Heavy wins Brazil order for six 500kV transformers

The deal for Andritz Hydro LTDA supports the Foz do Areia expansion in Paraná state and is paired with an MOU to jointly develop hybrid grid stabilization equipment.

Summary

verifying reliability

Terms & Concepts

No specialized terms available for this topic.